First there were foundations.
- Jun 1, 2021
- 1 min read
My two townhouses are built on a "floating slab" design. They have been designed to meet Christchurch earthquake standards. The design and redesign extended the building consent process by an extra 6 weeks and swallowed a substantial amount of extra cash for the priviledge of being "earthquake proof". But who can really know until there is an earthquake?
And so I finally realised the importance of there being no topsil left before you build - topsoil doesn't give a solid foundation, so scrape it off. Great for building, but a disaster for my permaculture aproach of growing healthy soils - no a chance of a healthy microbiome on this site at present.






link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link link